Free roof-suitability & savings estimate- written numbers in 24 hours, no door-knockers, no obligation · Get my estimate →
Maple-Ash · South Tempe · The Lakes · Warner Ranch. 95+ residential installs since 2014, typical 7.8 kW design, 6.6 peak sun-hours per day. Free written design quote in 24 hours.
Tempe · SRP
Tempe homes are older and smaller - Maple-Ash and South Tempe average ~2,200 sq ft 1965–1985 stock - so designs run 7–9 kW with conservative shading allowances for the mature mesquite canopies that come with those neighborhoods. We do a tree-shading walk during the site survey. Permit timeline is about 6 business days.
Avg peak sun-hours
6.6hrs/day
Annual mean from NREL PVWatts for the Maricopa County latitude band.
Typical system size
7.8 kW
Median residential nameplate across SunWright Tempe installs (offsetting 95% of typical post-EV-charger usage).
Year-one production
13,500kWh
Estimated first-year AC output for the typical 7.8 kW Tempe design.
Utility & interconnect
SRP
Net-metering / export-credit paperwork filed in-house. City of Tempe Community Development permits typically clear in 6–10 business days.
Dominant roof type
Asphalt shingle (older 60s–80s stock)
Engineered flashings + tile-lift crew on every applicable job - no compromised water paths.
Tempe installs
95+
Residential rooftops powered since SunWright opened in 2014. Live production data available on any nearby reference.
ZIP codes served:85281 · 85282 · 85283 · 85284
How a SunWright install works
No high-pressure door-to-door sales. No surprise change orders. Every SunWright install follows the same four steps, and we put the three-week target in writing in your contract.
Free quote in 24 hours
Drop your bill, your zip, and a roof photo. A NABCEP designer comes back inside 24 hours with the system size, the layout, and the written price - every line itemized.
Engineered design + permit
Structural review, electrical plan, and city of Phoenix permit pulled inside 10 business days. Utility interconnection paperwork filed in parallel so the install date holds.
Install in 1–3 days
Our W-2 install crew rolls in with all equipment on the truck. Most residential jobs are panels-on-roof in one day; commercial flat-roof and carport in 2–3.
Activate & monitor for 25 years
Inspector signoff, utility commissioning, system turn-on. SolarSight monitoring runs from day one and we send a one-page production report every quarter.
From the neighborhood
5-star average across 480+ Google reviews. We’re happy to share full monthly-production data on any nearby install - or just drive you past the rooftop with our yard sign on it.
Three solar companies pitched us. SunWright was the only one who showed us PPA, loan, AND cash numbers side by side. Eight months in, our APS bill is $14 and we run AC at 74° all summer.$211/moactual savings
Anna M.
Crew was on time, panels were on the roof in one day, and the city inspector signed off in five days flat. They did the SRP rebate paperwork for us. Best contractor experience we’ve had in this house.$232/moyear-one bill drop
Diego R.
We went PPA because we’re moving in five years. SunWright still treated it like our forever house - engineered for the pool load, walked us through the transfer clause, no pressure to upsell to a loan.$148/mooff APS bill
Priya & Sam V.
Free quote in 2 minutes
Drop the form below or call (602) 555-0177 and a NABCEP designer dispatched out of our Scottsdale HQ will be on your Tempe roof inside 48 hours with the layout, the production model, and the written number.
Mon–Sat, 7am–7pm
(602) 555-0177